2026 allocation open — 15 build slots a year Aluminium · Hand-welded · Split, HR  →  Delivered CONUS info@colnago-usa.com
HomeModelsConfigureCharterTaxShipyardAboutContact

The yard  ·  Split, Croatia  ·  43°30’N 16°26’E

Eight months,
one shed, no rush.

Every stage happens on the Split waterfront under one roof — and you are welcome to walk the floor at any of them.

01 · Week 0

Specification

A blank sheet with the yard. Hull, layout, propulsion, deck, trim and electronics, agreed line by line before a plate is cut.

02 · Week 4

Plate & weld

Marine-grade aluminium cut and welded by hand. The most-photographed stage, and the one most owners fly out to see.

03 · Week 16

Fairing & fitout

Hull faired, Cummins diesel rigged, joinery hung, teak laid and upholstery stitched by the same in-house team.

Bare aluminium frames
FramesThe bare hull

Aluminium shows every weld and every degree out of true. That is exactly why the yard builds in it.

Welding
WeldingBy hand, throughout

No robots. Sixty craftsmen, most of whom have been on the floor more than a decade.

Split, Croatia
Sea trialOut through the islands

Trialled from Split harbour with you aboard, then shipped to Fort Lauderdale.

§ Footage

From bare plate
to the dockside.

Straight from the yard floor: a hull in the shed, a C38 in fit-out, and a finished boat lifted at the port.

Split · Plate & weldThe bare hull
Split · Fit-outUpholstery and helm
DeliveryCraned at the port

§ Film

Watch the yard
at work.

Eight months on the floor in Split, cut down to a few minutes.

Inside the Colnago Marine shipyard in Split

The film is hosted on YouTube and only loads once you press play, so nothing is requested from them until you ask for it.

§ Visit

Come and see it.

Owners are welcome at any stage of the build, and most come twice: once to watch the plate go down, and once to take her out through the islands. We will arrange the trip.

Arrange a visit →
Hull in build